In june 2020 has been done the commisioning of the ship boarding platform used on the new Cruise ship under costruction in the Fincantieri Monfalcone shipyard.
The boarding platform has been designed by ITS studio on behalf of Naval Impianti .
EDF France Beaumont Monteaux Dam commisioning
In July its studio on behalf of ATB commisioned the forth sluice gate of the Beaumont Monteaux dam.
Navim pantograph platform project
In March its studio studied and developed an elevating platform for loading and unloading material from cruise ships.
The project was commissioned by Naval Impianti.
Straddle Carrier T37B
Houston Texas.
In November the second machine was commissioned.
the Straddle carrier was designed by kits at the request of DEAL in 2018
Its dealt with the electrical mechanical design, software plc and commisioning
Spreader beam Florida
Spreader beam L125 commissioned by DEAL, designed by ITS Studio July 2019.
Cruise ship lift platform
Design of an elevating platform for a cruise ship commissioned by Naval Impianti September 2019
Houston Straddle carrier T37A
In June we followed the commissioning of the strddle carrier designed by us on behalf of Deal.
The machine will be used for the construction of the ship channel bridge in Houston
https://www.shipchannelbridge.org/
Cable reel carrier lifting beam
Its cable reel lifting beam.
Features:
– Capacity :300kg.
– Four cable reel adjustements.
– Safety anti-overthrow system.
Deal Straddle carrier
In March 2018, DEAL commissioned to ITS studio the development and design a Straddle carrier.
ITS designed the mechanical and electrical part.
In March 2019 the machine has been placed in service.
Landing walkway
Landing walkway draft study